Section 07450

FLUID APPLIED ROOFING



PART 1 – GENERAL



1.01 SECTION INCLUDES
A. Fluid applied, waterproof acrylic roof coating.
B. Perimeter edging and flashing.
1.02 RELATED REFERENCES
A. Section 09980 : Concrete substrate with medium broom finish.
B. Section 07900 : Joint Sealers
1.03 REFERENCES
A. ASTM D3393 – Waterproofness.
B. ASTM E96 – Water Vapor Transmission of Materials.
C. Surface Temperature
D. ASTM D-903 – Peel Strength
E. EPA – Environmental Protection Agency – V.O.C. Ruling
F. ASTM D2523 Elongation & Breaking Strength
G. ASTM D96 Water Vapor Transmission

1.04 PERFORMANCE REQUIREMENTS

A. Install coating to conform to the following:

PropertyASTM TestResult

Moisture Vapor PermeabilityE960.17/0.32

Peel Strength
Plywood
ConcreteD903
8 5/10
6.6/11.9

WaterproofnessD3393No detectable Liquid

Surface Temperature Cooler Than Asphalt

Breaking StrengthD252340/132

ElongationD252321/32

Water Vapor TransmissionD960.18/0.22

1.05 QUALIFICATIONS
A. Applicator: Company specializing in resinous matrix coating applications with documented experience.
B. Supervisor: Trained by product manufacturer.
1.06 MOCK-UP
A. Provide mock-up of 10 square feet of coating and 3 lineal feet of base under provisions of Section 01400.
B. Provide analysis of mock-up under provisions of Section 01400.
C. When accepted, mock-up will demonstrate minimum standard for the work. Mock-up may not remain as part of the work.
1.07 SUBMITTALS
A. Submit product data under provisions of Section 01340.
B. Submit two samples 12 x 12 inches in size illustrating color and variation.
C. Submit manufacturer’s installation instructions under provisions of Section 01340.
D. Material Safety Data Sheets for each layer of coating system.
1.08 OPERATIONS AND MAINTENANCE DATA
A. Submit cleaning and maintenance data under provisions of Section 01700.
B. Include procedures for stain removal, repairing surface, and cleaning.
1.09 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials in original packages and containers with seals unbroken and bearing manufacturer’s labels containing brand name and directions for storage and mixing with other components.
B. Store materials to comply with manufacturer’s directions to prevent deterioration from moisture, heat, cold, direct sunlight, or other causes. Material shelf life approximately 2 years.
C. Keep materials from freezing.
1.10 ENVIRONMENTAL REQUIREMENTS
A. Comply with roof coating manufacturer’s directions for maintenance of substrate temperatures, ventilation, and other conditions required to execute and protect work.
1.11 WARRANTY
A. Manufacturer’s Warranty: Five (5) year written limited material warranty Issued by Manufacturer.



PART 2 – PRODUCTS



2.01 MANUFACTURER
A. Manufactured by ENVIRONMENTAL COATING SYSTEMS, INC.,
668 North Coast Highway, #511, Laguna Beach, California 92651 Phone: (949) 497-4562
Toll Free: (800) 255-3325 • Fax: (949) 497-8493 • E-Mail: info@alldeck.com
2.02 MATERIALS
A. All Deck Acrylic Caulking Compound: Use for filling small to medium sized cracks and depressions and over seam metal and joint. Used with fiberglass mesh for flexible joint system.
B. Seam Metal: Light gauge, hot zinc dipped, sheet metal for finishing wood joints in substrate.
C. Fiberglass Mat: Use for reinforcing over wood and metal joints.
D. Fiberglass Mesh: Use for reinforcing flexible joint system.
E. All Deck Clear Acrylic Sealer: Use to prepare concrete and aggregate concrete substrates
F. X-R Roof Coating: First coat approximately 60 sq. ft. per gallon, Second coat approximately 100-125 sq. ft. per gallon, and, Third coat approximately 150-200 square feet per gallon. Coverage rate of all three coats combined is approximately 40 sq. ft. per gallon. Application may be by brush, roller, spray, or squeegee.
2.03 COLORS
A. Provide coating in white.
(B. Provide custom colors.)
2.04 MIXING
A. Stir each container of coating before using.



PART 3 – EXECUTION



3.01 EXAMINATION
A. Verify that substrates are ready to receive work, that substrate surface is clean, dry and free of grease, oil, powder, or any substances which could affect bond.
B. Do not begin work until concrete substrate has cured. Wood substrate should be dried to a maximum content of 12 percent. Metal substrate should be free of all rust and flaking material.
C. Beginning of installation means acceptance of existing substrate.
3.02 SUBSTRATE PREPARATION
A. Perform preparation and cleaning procedures in compliance with coating manufacturer’s instructions for particular substrate conditions involved and as herein specified.
B. Clean substrate surface free of foreign matter; seal with Clear Acrylic Sealer where required.
C.
1. Concrete: Grind off all irregularities. Fill all hairline cracks with Patching Compound. Treat all moving cracks with 4” fiberglass mesh and 2 coats of Caulking Compound, as per manufacturer’s instructions.
2. Plywood: Prepare wood joints with 4” fiberglass mat and two coats X-R Roof Coating. Install flashing and counter flashing as per plans. Apply two thin coats of All Deck Patching Compound to all metal, to cover nails, and to feather out, in accordance with manufacturer’s instructions.
3. Metal: Clean off all loose material. Spot prime all rusted areas with rust inhibiting primer. Reinforce all seams/joints in metal roof with 4” fiberglass mat and two coats of X-R Roof Coating.
3.03 COATING APPLICATION
A. Apply in accordance with manufacturer’s printed instructions.
B. Use fiberglass mesh and All Deck Caulking to seal cracks, joints, seams, protrusions, perforations, termination paints and other open areas.
C. Make sure the area of application has been properly prepared. After all preparation and reinforcing has dried, apply X-R Roof Coating as follows: 1st coat approximately 60 sq. ft. per gallon, 2nd coat approximately 100 – 125 sq. ft. per gallon and 3rd coat approximately 150 – 200 sq. ft. per gallon.
D. Repair bubbles in accordance with manufacturer’s instructions for specific type of situation.
3.04 PROTECTION
A. Protect roof coating materials from damage and wear during constructionoperation. Where temporary covering is required, comply with manufacturer recommendations for protective materials and method of application. Remove temporary covering prior to cleaning for final inspection.
B. Protect elements surrounding the work of this Section from damage of disfigurement.
C. Restrict foot traffic on X-R Roof Coating.